Tag: Tim Eyre

back to school

Before the First Bell: Stopping Mold Before Schools Reopen

Empty schools can look quiet during summer break, but their roofs, plumbing, and heating, ventilation, and air conditioning (HVAC) systems remain active. With fewer people present to notice a musty odor, a stained ceiling tile, or water under a mechanical unit, a small moisture problem can spread for days or weeks. The U.S. Environmental Protection […]

Cold Snaps, Burst Pipes, and a Facility’s First-Hour Playbook

Cold snaps don’t always arrive with a major storm. A quick drop in temperature after a mild stretch can be enough to stress vulnerable piping, especially in perimeter zones and low-circulation spaces. For facilities management teams, a frozen or burst pipe can turn into tenant disruption, safety exposure, and avoidable downtime in a matter of […]